Product Details
Review product information, specifications, and procurement details.
Electric Sequencer 1 Timing 1 Switch
Electric Sequencer Application HVAC Systems Refrigeration Systems Auxiliary Switch Off Maximum 30 sec Auxiliary Switch Off Minimum 1 sec Auxiliary Switch On Maximum 90 sec Auxiliary Switch On Minimum 30 sec Body Material Phenol Formaldehyde/Copper/Ferrum Cover Material Phenol Formaldehyde/Copper/Ferrum Full Load Current @ 120V AC 10 A Full Load Current @ 240V AC 7 A Installation Orientation Horizontal Vertical Locked Rotor Current @ 120V AC 72 A Locked Rotor Current @ 240V AC 42 A
Your Price
Contract Pricing
Product Overview
Electric Sequencer Application HVAC Systems Refrigeration Systems Auxiliary Switch Off Maximum 30 sec Auxiliary Switch Off Minimum 1 sec Auxiliary Switch On Maximum 90 sec Auxiliary Switch On Minimum 30 sec Body Material Phenol Formaldehyde/Copper/Ferrum Cover Material Phenol Formaldehyde/Copper/Ferrum Full Load Current @ 120V AC 10 A Full Load Current @ 240V AC 7 A Installation Orientation Horizontal Vertical Locked Rotor Current @ 120V AC 72 A Locked Rotor Current @ 240V AC 42 A